Santa Susana High School New Auditorium
General Contractor: McGillivray Construction
Owner: Simi Valley Unified School District
Project Value: $2.1 M
Official Title: Santa Susana High School New Auditorium (Bldg. J)
Architect: HMC Architects
Scope of Work: Ironman, Inc. was responsible for a ground up steel performing arts center. Challenges included very deep footings with 12' long anchor rods and 20,000lb. columns. The gridiron level and gratings along with the rolled steel "clouds" for the acoustical properties were all handled professionally and expertly by the team at Ironman, Inc.
Owner: Simi Valley Unified School District
Project Value: $2.1 M
Official Title: Santa Susana High School New Auditorium (Bldg. J)
Architect: HMC Architects
Scope of Work: Ironman, Inc. was responsible for a ground up steel performing arts center. Challenges included very deep footings with 12' long anchor rods and 20,000lb. columns. The gridiron level and gratings along with the rolled steel "clouds" for the acoustical properties were all handled professionally and expertly by the team at Ironman, Inc.